PROJECTS EXECUTED
 
 
 
  1. Connecting control of 70 Wells to control central panel - Suweihan
    (Abu Dhabi – U.A.E) (worked with M/S Bin Ham Contracting Company).
  2. Fabrication & Commissioning of Well Control Panel - Water department
    (Al-Ain – U.A.E) (worked with M/S Kent).
  3. Commissioning of Drain Water Pump System - New Al-Ain Market
    (Al-Ain Municipality – U.A.E) (worked with M/S Auto Control Systems).
  4. Fabrication of 20 Numbers of Green House Control Panels (2 Fans + 1 Pump) (4 Fans + 2 Pumps).
  5. Commissioning work of Paging System CB_901 (M/S Albert Anderson Electronics GmbH, Germany) – Water & Electricity Department (Al-Ain – U.A.E)
    a. Installation of Central.
    b. Installation of Paging System.
  6. Carried out Refurbishment and maintenance work of Plant - Al-Ain Juice Factory
    (Al-Ain – U.A.E).
  7. Carried out complete Refurbishment of Workshop - Al-Ain Sewage Department
    (Al-Ain Municipality – U.A.E).
  8. Carried out Testing and Commissioning of Power Transformers in Al-Ain Compost Plant (Al-Ain – U.A.E).
  9. Installed Energy Control Systems (ECS) Pilot Project in Ajman for Federal Electricity & Water Authority (Ajman – U.A.E).
    Installed: - Energy Meters.
    1. Summators.
    2. MCB's.
    3. Modem.
    Installed demonstration kit for six months.
  10. Testing & Commissioning
    ii. Transformer.
    iii. High Voltage cable Pressure test.
    iv. Primary Injection.
    v. Secondary injection – Protection Relays.
    vi. Indicating meters.
    vii. Voltage Recorders.
    viii. Air Circuit Breakers (Merlin-Gerin).
  11. Fabrication and commissioning of Fountain Control Panels; 12 Nos - Sheikh Khalifa Garden
    (Al-Ain – U.A.E). (worked with Al Nael Electrical Contracting Company).
  12. Fabrication and Commissioning of main fountain in Ain-Al Faydah
    (Al-Ain – U.A.E). (worked with Al-Nael Contracting Company).
  13. Commissioning work of Sulzer Engine Diagnostic System SED'S (Al-Ain – U.A.E).
    c. Computer pdp 11/34.
    d. Temperature sensors, Pressure sensors, Angular transmitter.
    e. 19" rack assembly & commissioning And testing of all transducers.
  14. Commissioning & Testing of Pneumatic Systems - S.W.D & Sulzer Diesel Engines (Al-Ain – U.A.E).
    f. Reducers.
    g. VPR's.
    h. Pneumatic Transmitter.
    i. Pneumatic Logic Box.
    j. Compressor System.
  15. Commissioning & Testing of mimic control panel of Fire Fighting System mainly in Power stations.
  16. Fabrication of Over Head Crane Control Panels.
  17. Electrical Installation and Public addressing System with CCTV surveillance system of Shopping Centre (Ajman – U.A.E).
  18. Electrical Installation of Flour Mill (Ajman – U.A.E).
  19. Electrical installation of Commercial Warehouses – Ali Abdullah Awazi Gargash – (Dubai – U.A.E).
  20. Electrical Installation of G + 7 story residential Building (Ajman – U.A.E).
  21. Testing & Commissioning of 6 numbers of 10MVA, 11/3.3kV Transformer for Chillers & 20 numbers of 1000kVA and 1500kVA, 11/0.415 Kv Transformers of Jumeirah Beach Residence Complex for M/s Drake & Scull (Dubai – U.A.E).
  22. Supply, Installation, Testing & Commissioning of 500kVA, 11/0.415kV Transformer, 11 kV Tee Ring main Unit, 20kVA (16kW) UPS, Main Distribution Board and 3 Kilometers 11kV Power Cable for Directorate of Military Works (Abu Dhabi – U.A.E).